Health & Safety - Construction (Design & Management) Regulations 1994

Addvance are aware of the Health & Safety and legal responsibilities of all parties during the Project, and co-ordinate activities between the Client, H&S Specialists, Designers and Contractors to create a safer a working environment.



CDM applies to all projects which
  • CDM always applies to DESIGN work.
  • Are notifiable to HSE
    • where project's construction Phase is longer than 30 days
      or
    • will involve more than 500 man days of construction work
  • Involves more than 5 persons working on site at any one time
  • Any project involving demolition or dismantling

Duties on Clients

  • To appoint competent
    • Designer
    • Planning Supervisor
    • Principal Contractor
  • To ensure construction does not start until Construction Phase Health and Safety Plan has been prepared
  • Provide Planning Supervisor with relevant information about site and existing structures within Pre Tender Health and Safety Plan, to include provision of O&M Manuals (M&E Drawings, Commissioning Certificates, Service records) and Site Survey to include Hazardous Materials

Duties on Designers

  • To inform Client of duties
  • To ensure as far as reasonably practical the design is safe to
    • Construct
    • Maintain
    • Repair
    • Demolish
  • To reduce the risk - hierarchy
  • To inform the planning supervisor of significant or unusual risks that could not be designed out as part of the Pre Tender Health & Safety Plan

Duties on Planning Supervisor

  • Check that design can be constructed without significant risk to workers
  • Ensure F10 Notice of the project is given to HSE
  • To ensure a Pre Tender Health & Safety Plan is prepared
  • To ensure that a Health & Safety file is prepared and delivered to the Client on completion

Duties of the Principal Contractor

  • Develop and implement the health & safety Plan
  • Assess competence and provision of adequate resources for H&S
  • Obtain and check Project specific Risk Assessments and Safety Method Statements from Contractor
  • Ensure the coordination & cooperation of Contractors
  • Ensure training for H&S is carried out
  • Have appropriate communication between contractors on site
  • Allow only Authorised people on site
  • Display F10 Notification
  • Monitor H&S performance
  • Pass information to the planning supervisor for Health & Safety File
Project Protocols CDM & Approvals Site Set Up
Project Team and responsibilities Appoint Competent Designer Appoint Site Manager
Management structure Appoint Competent Planning Supervisor Site Manger Induction/H&S
Financial reporting & Cost Control Site Survey and Investigation.
Information File
Advise Tenants
Project Intranet Design for Safety
  • Construction
  • Maintain
  • Repair
  • Demolish
Secure Site
Barrier off and label exposed/Dangerous areas
Project Sign off Services Survey Label Site
Visitor & Contractors Rules
Team Meetings Services Drawing for Landlord and Building Regulations Site Security Arrangements
Team Communications Preliminary review with Fire Officer & Building Control Site Office/Reception
Meeting Facility
Design Sign Off Preliminary Review with Landlords/Managing Agents First Aid Facilities and Designated First Aider
Finishes sign Off Prepare Pre Tender H&S Plan Accident Book
Project Scope and Specification Prepare Plans and specification for Landlords Approvals/Licence Fire safety, equipment and procedures.
Appoint Fire Wardens
Programme and CPA Prepare & Submit Plans and specification for Building regulations approval Mark Emergency routes and Corridors
M&E Specification and design Identify significant or unusual risks within design that could not be designed out Designate & mark Emergency vehicle spaces
Working Drawings
Updates/changes to specifications and drawings - circulation
Appoint Competent Principle Contractor Isolate and label Electrical Facilities
Variations Submit F10 Notice to H&SE Temporary Lighting and Power
Staff Briefing Develop H&S Plan
  • Undertake or obtain risk assessments and method statements for all works
  • Ensure Contractor Co-ordination and Co-operation
  • Ensure H&S Training is carried out
  • Contractor Communication
  • Allow Authorised personnel only to site
Designate & mark traffic routes, delivery and parking bays
Approved Suppliers:
  • Cost of Ownership
  • Quality
  • Continuity & Warranties
  • Environmental
  • Sustainability
Prepare Construction Stage H&S Plan Removal of dangerous Materials
Tender Process and Documents Advise Building Control of Commencement of Works Display F10
Arrange Site access with landlord Visitor Book
Display F10 Contractors Facilities
Implement H&S Plan Designate safe and secure Contractor Materials Storage area
Monitor H&S Performance Segregation and Storage of Hazardous material
Building Regulation Notices Control of Noise and Vibration
Building Regulation Site Visit Control of Lifting Operations
Manual Handling
Prepare as Built drawings Working at Height/Use of Ladders
Prepare H&S File Permits to work:
  • Hot Works
  • Electrics
  • HVAC
  • Plumbing & Waste
  • Isolation
  • Core areas
P.P.E.:
  • Contractors personal Protective
  • Equipment
  • Hard Hats
  • Safety Shoes
  • High Visibility Jackets
  • Face masks
  • Goggles
Verification, Exchange and Access to Design Information
Contractor Site Induction
  • Emergency
  • First Aid
  • Contractors on site
  • H&S
  • Designated areas
  • Prohibited activity and areas
Verify H&S of personnel and equipment
H&S Review of site and contractors
Working Drawings and Specification
Site Set Out
Client/Design Approval of layout
Deliveries and Off Loading schedule
Waste Disposal
Site Protection & Cleans
Maintain Plant & Equipment



Addvance Business Solutions Limited
Allease House, Townsend Piece, Bicester Road, Aylesbury, Buckinghamshire. HP19 8BQ
Tel +44 (0)1296 393372     Fax +44 (0)1296 393312     Email info@addvance.co.uk

Site reloaded by Milton Keynes Cabling - Site designed and constructed by Purple Frog